Archive for February, 2006

24
Feb

Keel Plating

   Posted by: admin    in Building Tesha

Keel side plating has begun.

picture-013.jpg picture-014.jpg picture-017.jpg

22
Feb

The Hull has been started

   Posted by: admin    in Building Tesha

Enough of the aluminum has arrived at YachtSmiths to commence building.  The lower halves of the first frames have been welded to an I-beam.

feb-2006-002.jpg feb-2006-003.jpg feb-2006-004.jpg picture-006.jpg picture-007.jpg picture-008.jpg picture-009.jpg

14
Feb

Russel Metals

   Posted by: admin    in Building Tesha

Russel Metals is cutting the 1/4″ and 3/4″ plates today and apparently the 1/2″ inch parts should show up today at YachtSmiths!  Would have been nice to get the 3/4″ inch stuff today.  The keel plates are in that load.  :)    Worked on the companionway hatch frames.

Hatch Frames

10
Feb

11,000lbs of Aluminum

   Posted by: admin    in Building Tesha

11,000lbs of aluminum have been ordered!  Should be arriving at YachtSmiths next week.  Cutting hatch frames.   Started cutting the wood for the companionway hatch with a new friend Amy.

Hatch Slats

5
Feb

Cut Files

   Posted by: admin    in Building Tesha

The cut files have been completed by Michael and are being reviewed by YachtSmiths.   Hopefully, in the next week or two, Russel metals will start cutting some aluminum.  Finished the test hatch I had been building.

Test Hatch

1
Feb

The Shed

   Posted by: admin    in Building Tesha

I’ve rented a storage near the room I’m renting to starting building the mahogany deck pieces.  No power, no lights, no heat.