Not much has happened the last few weeks on SV Tesha. Mostly likely, things will pick up in the new year after everyone gets back from vacation I can save away some money.
The pictures are of the mast welding Ryan and I did in November. We welded all the tangs and tabs onto the upper most portions of the mast.
I did some work on the dingy this week, working on the seats mostly, and cleaning up some the joints before priming the water tight lockers.
- Mast tubing arrives
- Ryan welding a tang
- Top of a mast
- Cutting seats for the dingy