8
Nov

Rails are on

   Posted by: TBurnett   in Building Tesha

Ryan put the rails on the boat this last week. I think they’ll do really nice and Amy has already mentioned doing some decorative ropework on them. Ryan also continued putting the rings at the shroud chainplates. We are going to use these for rigging the halyards.

On the dingy, Amy and I fiberglassed the inside seam of the lowest plank. Amy pretty much did the whole thing herself, and I am amazed how much better she is with epoxy than I. I added the cutwater afterwards and also installed a few seat cleats.

This entry was posted on Sunday, November 8th, 2009 at 7:51 pm and is filed under Building Tesha. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Leave a reply

You must be logged in to post a comment.